Test Case | Expected outcome | Pass / Fail | Tester's Comments | |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Login to Lawmaker as an SIH or SGLD User | Dashboard displayed (or last tab associated with the project you last viewed) |
| |||||||||||||||||||||||||||||||||||||||
2 | Create a New Project
| Create new project modal is shown Includes Type, Sub-type, Title, and Procedure fields Able to select ‘UK Statutory Instruments’ from Type drop-down When UK SI is the Type, Sub-type drop-down shows 12 entries, including Regulations, Order, Rules, Resolution, Other When Scottish SI is the Type, Sub-type drop-down shows 9 entries, including Regulations, Order, Rules, Resolution, Other Procedure drop-down shows 8 options, including Draft Affirmative, Draft Negative, Made Affirmative, Made Negative |
| |||||||||||||||||||||||||||||||||||||||
3 | Add the required information to the fields in the modal and click on Create | Editor Opens Expand | | |||||||||||||||||||||||||||||||||||||||
|
| |||||||||||||||||||||||||||||||||||||||||
4 | Edit the Title from the Document Information panel in the Editor | In the Editor, the Title is updated at the top of the doc After saving, the Title is also updated in the Project tab (Press F5 to refresh the page) |
| |||||||||||||||||||||||||||||||||||||||
5 | Add a Subject, extent Extent and subSub-subject Managing Subject, Extent and Subsubject
| Subject placeholder is updated |
| |||||||||||||||||||||||||||||||||||||||
6 | Add Type information to into the enabling powers placeholders which appear in the enacting words at the start of the SI; you can use the following example: 15(7)(B) of the Education Act 2006 (You can use these details of some real enabling provisions: sections 29A(3), 30(4) and 96(9) of the Value Added Tax Act 1994)
| The content of the enacting words is updated Additional blocks of text containing paragraphs and sub-paragraphs can be added |
| |||||||||||||||||||||||||||||||||||||||
7 | Entering new Add some provisions Inserting provisions and other elements
| Able to add Rules, Articles, or Regulations, depending on the SI sub-type Numbers and Headings appear in bold in the Editor Paragraphs and sub-paragraphs under each top-level provision are indented The numbering will be correct: provisions are given sequential numbers or letters The Structure view View on the left-hand side of the Editor window is updated as provisions are added |
| |||||||||||||||||||||||||||||||||||||||
8 | Create some more complex structure; add Parts and cross headings using the Content Completion AssistantCCA | Can create parts Parts and cross Cross headings |
| |||||||||||||||||||||||||||||||||||||||
9 | Promote and demote some elements in a provision | Elements can be promoted and demoted according to the Promotion and Demotion rules |
| |||||||||||||||||||||||||||||||||||||||
10 | Insert Explanatory Notes
| ENs Explanatory Notes appear at the end of the document |
| |||||||||||||||||||||||||||||||||||||||
11 | Insert a Commencement History Block | Commencement History Block appears at the end of Document Heading is ‘NOTE AS TO EARLIER COMMENCEMENT ORDERS’ Table consists of three columns: Provision, Date of Commencement, and S.I. No. |
| |||||||||||||||||||||||||||||||||||||||
12 | Save the document | A progress bar appears and progresses to 100% A message is displayed saying ‘Document Saved’ On the project tab, the version version’s last modified date/time is the same as the date/time it was saved |
| |||||||||||||||||||||||||||||||||||||||
13 | Insert a Table of Contents | Table of Contents is inserted at the start of the document |
| 14 | Delete a Table of Contents
| Table is removed | Entries in the ToC correspond to the structure created in the text of the doc |
| ||||||||||||||||||||||||||||||||||
1514 | Generate a PDF | PDF is created Green success toastie displays in bottom-right of screen Toastie includes a link to the PDF Expanding the version snapshots on the Project Tab shows a PDF entry From the Actions menu next to that snapshot version, ‘View PDF’ can be selected PDF formatting resembles other SIs on http://www.legislation.gov.uk/uksi |
| |||||||||||||||||||||||||||||||||||||||
1615 | Generate a Large Print PDF | Large print PDF is created and the text looks okay (check for overlapping content) |
| 17 | Delete the Explanatory Notes | Explanatory Notes are removed |
| 18 | ||||||||||||||||||||||||||||||||||
16 | Close the Editor Click on Close Editor button (top, -left) | The If no changes have been made to the document since it was last saved, the Editor tab closes If changes have been made since the last save, a modal appears prompting you to save the document Able to select Save changes, Discard changes, or Cancel If save or discard are selected, the browser tab for the Editor is closed If Cancel is selected, the Editor tab remains open |
| |||||||||||||||||||||||||||||||||||||||
1917 | Duplicate a document version | On the project tab, a new folder (optional) and document version is created Labels for the new folder and new version match the text added in the modal |
| |||||||||||||||||||||||||||||||||||||||
2018 | Move a document versionMove | Able to move document to a new or alternative folder |
| |||||||||||||||||||||||||||||||||||||||
2119 | Create a new blank working version in the Project | New document created and displayed as a green tile on the project tab under the appropriate folder |
| |||||||||||||||||||||||||||||||||||||||
2220 | Add and change some document information using the Document Information panel, including the Date and SI number | Date and SI Number appear above the subject |
| |||||||||||||||||||||||||||||||||||||||
2321 | Add and update made, laid and coming-into-force dates
| The Dates at the start of the document are updated accordingly |
| |||||||||||||||||||||||||||||||||||||||
2422 | Insert a Signature Block | A signature block is inserted Add text in some boxes Ensure a Seal is added for Test 25 (Creating zip file) |
| |||||||||||||||||||||||||||||||||||||||
2523 | From the Insert menu, select Insert Front Matter Elements | A modal appears which includes a ‘Front matter element’ pull-down list; the list contains five options | Status | | colour | Green
Expand | |
---|---|
|
Status | ||||
---|---|---|---|---|
|
| |
Select one of the following Options: Laid in draft Correction Resolution Royal Presence |
( |
Do not test |
the ‘Approved’ option |
at this stage) Click Insert |
A modal appears which includes a ‘Front matter element’ pull-down list; the list contains five options
Modal includes a drop-down menu for Front matter elements
The ‘Rubric’ option pull-down list in the modal changes depending on what Front matter element is selected
The On clicking Insert, the Rubric is inserted at the start of the document
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Duplicate document and Convert to Made
https://lawmaker.scrollhelp.site/help/live/converting-a-draft-si-ssi-into-a-made-version
XML is updated from Bill/ukdsi to Act/uksi
Draft is removed from the banner
Removes procedural rubric
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Mark a version of the document as Signed
Marking a document as 'Signed'
Note |
---|
Currently (v.15.3.0 and v.16.0) it is only possible to perform this and the next two actions on a generated PDF which is labelled ‘PDF’; if another label has been given to the PDF then this option won’t appear in the menu. |
A significant version of the document is created, labelled “Signed” and visible on the right-hand side of the Project tab
Other users in the same organisation will be able to view that significant version
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Download a zip file of a document from the Project tab
A zip file is created containing XML, PDF and TIFF files
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Submit a version of the document to TNA
Submitting an SI or SSI to TNA
Note |
---|
Currently (v.15.3.0 and v.16.0) it is only possible to perform this action on a generated PDF which is labelled ‘PDF’ |
Success message toastie displays
A new significant version is created, labelled ‘Submitted to TNA’
Document available on the API
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Add the Approved rubric
Expand | ||
---|---|---|
| ||
Open the SI in the Editor From the Insert menu, select ‘Inserting Front Matter Elements’ |
Under ‘Front matter element’, Select ‘Approved’ Select one of the ‘Approved by’ options and click |
Insert |
The Rubric options modal lists several Approved by options
The appropriate rubric is inserted above the Date Block
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|